Project documents
- Ministry of Finance Republic of North Macedonia Public Sector Energy Efficiency Project P149990
- Environmental and Social Management Framework (ESMF)-PSEEP – revised 28022025
- Environmental and Social Commitment Plan – revised 2025
- Stakeholder Engagement Plan (SEP) for PSEEP – revised 28022025
- Notice of availability of documents and public consultation for the revised Environmental and Social Management Framework (ESMF) for the restructuring of the Public Sector Energy Efficiency Project in the Republic of Macedonia
- Public call for participation in the public consultation process for documents related to environmental and social aspects
- DRAFT FOR PUBLIC CONSULTATION: ENVIRONMENTAL AND SOCIAL ASPECTS FRAMEWORK FOR THE PUBLIC ENERGY EFFICIENCY PROJECT SECTOR
- STAKEHOLDER ENGAGEMENT PLAN (SEP) for the PUBLIC SECTOR ENERGY EFFICIENCY PROJECT Republic of North Macedonia
- ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN
Procurement procedures
- CALL FOR EXPRESSION OF INTEREST PUBLIC SECTOR ENERGY EFFICIENCY PROJECT (IBRD 9038MK) TECHNICAL ASSISTANCE: SUPERVISION OF CONSTRUCTION WORKS FOR REPLACEMENT OF PUBLIC STREET LIGHTING SYSTEM IN MUNICIPALITY OF LOZOVO, RANKOVCE AND DEBRCA
- Terms of Reference (TOR) Supervision of Works for Replacement of Public Lighting System in Municipality of Lozovo, Rankovce and Debrca
- CALL FOR TENDER (Tender) Construction Works – Reconstruction of 8 (eight) public health institutions with measures to increase energy efficiency in the Republic of North Macedonia
- Tender documentation for Construction Works – Reconstruction of 8 (eight) public health institutions with measures to increase energy efficiency in the Republic of North Macedonia
- CALL FOR TENDER (PPP) Construction Works – Reconstruction of 6 (six) public health institutions with measures to increase energy efficiency in the Republic of North Macedonia
- Tender documentation for Construction Works – Reconstruction of 6 (six) public health institutions with measures to increase energy efficiency in the Republic of North Macedonia
- CALL FOR EXPRESSION OF INTEREST – TECHNICAL ASSISTANCE: SUPERVISION OF CONSTRUCTION WORKS FOR RECONSTRUCTION OF 14 PUBLIC HEALTH INSTITUTIONS WITH MEASURES TO INCREASE ENERGY EFFICIENCY IN THE REPUBLIC OF NORTH MACEDONIA
- TERMS OF ENGAGEMENT – TECHNICAL ASSISTANCE: SUPERVISION OF CONSTRUCTION WORKS FOR RECONSTRUCTION OF 14 PUBLIC HEALTH INSTITUTIONS WITH MEASURES TO INCREASE ENERGY EFFICIENCY EFFICIENCY IN THE REPUBLIC OF NORTH MACEDONIA
- CALL FOR EXPRESSION OF INTEREST – TECHNICAL ASSISTANCE: SUPERVISION OF WORKS FOR REPLACEMENT OF THE PUBLIC LIGHTING SYSTEM IN THE MUNICIPALITY OF PROBIŠTIP
- CALL NO. PSEEP01/2021
- ANNOUNCEMENT FOR A FIXED-TIME WORKING ENGAGEMENT ON THE PROJECT FOR ENERGY EFFICIENCY PROJECT IN THE PUBLIC SECTOR
- TERMS OF REFERENCES FOR THE ELECTRICAL ENGINEER
- TERMS OF REFERENCES FOR THE MECHANICAL ENGINEER
- TERMS OF REFERENCE TO DEVELOP ENERGY EFFICIENCY FUND
- CALL FOR EXPRESSION OF INTEREST – TECHNICAL ASSISTANCE: ENERGY EFFICIENCY DEVELOPMENT FUND
- ANNOUNCEMENT FOR A FIXED-TIME WORKING ENGAGEMENT ON THE PROJECT FOR ENERGY EFFICIENCY PROJECT IN THE PUBLIC SECTOR
- TERMS OF REFERENCES FOR THE ELECTRICAL ENGINEER
- ANNOUNCEMENT FOR A FIXED-TIME WORKING ENGAGEMENT
- TERMS OF REFERENCES FOR THE ENERGY EFFICIENCY ASSOCIATE
- Terms of Reference (TOR) – Consulting Company for development of the detailed energy audit reports, detailed designs with technical specifications for energy efficient building renovations and technical audit
- CALL FOR EXPRESSIONS OF INTEREST – TECHNICAL ASSISTANCE: DEVELOPMENT OF DETAILED ENERGY AUDIT REPORTS, DETAILED DESIGNS WITH TECHNICAL SPECIFICATIONS FOR ENERGY EFFICIENT BUILDING RENOVATIONS AND TECHNICAL AUDIT
- CALL FOR EXPRESSIONS OF INTEREST – TECHNICAL ASSISTANCE: DEVELOPMENT OF FEASIBILITY STUDIES AND DETAILED DESIGNS FOR STREET LIGHTING IMPROVEMENTS LEADING TO ENERGY EFFICIENCY IN FOUR MUNICIPALITIES IN NORTH MACEDONIA
- TERMS OF REFERENCE DEVELOPING OF FEASIBILITY STUDIES AND DETAILED DESIGNS FOR IMPROVEMENT OF STREET LIGHTING LEADING TO ENERGY EFFICIENCY IN FOUR MUNICIPALITIES IN NORTH MACEDONIA
- CALL FOR EXPRESSIONS OF INTEREST – MK- LOT 1 TECHNICAL ASSISTANCE: DEVELOPMENT OF DETAILED ENERGY AUDIT REPORTS, DETAILED PROJECTS WITH TECHNICAL SPECIFICATIONS FOR ENERGY EFFICIENT BUILDING RECONSTRUCTIONS AND TECHNICAL AUDIT
- Terms of Reference (TOR) Consulting Company for development of the detailed energy audit reports, detailed designs with technical specifications for energy efficient building reconstructions and technical audit of public healthcare buildings
- CALL FOR EXPRESSIONS OF INTEREST – TECHNICAL ASSISTANCE: SUPERVISION CONSTRUCTION WORKS FOR RECONSTRUCTION AND ADAPTATION OF THE BUILDING OF THE PRIVATE INSTITUTION UNIVERSITY CLINIC FOR PSYCHIATRY IN SKOPJE
- Call for Bids – “Reconstruction and adaptation with improvement of energy efficiency (first phase) of the PRIVATE INSTITUTION UNIVERSITY CLINIC FOR Psychiatry in Skopje”
- REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – SELECTION OF COMPANIES) MK-MOF-001-2022-CS-QCBS – ToR – Consulting company for the preparation of detailed energy audit reports, basic designs with technical specifications for energy efficient reconstructions of buildings, revisions of basic designs and environmental and social management plans
Ongoing projects
Form for submitting comments on the EIAMP
PHI University Clinic for Physical Medicine and Rehabilitation – Skopje
Brief description of the project: The implementation of this project includes insulation of the thermal envelope of the building, further replacement of the old facade carpentry, insulation of the floors on the -1 side, introduction of energy-efficient lighting, complete replacement of the heating system of the premises and installation of a new source of central energy supply for heating (air-to-water heat pump), while individual units will be installed in the rooms and offices that need to work in multiple shifts (first aid, laboratory, etc.).
- NOTICE of availability of the document Environmental and Social Management Plan (ESMP) – Checklist and public hearing for the sub-project: Reconstruction of the PHI University Clinic for Physical Medicine and Rehabilitation – Skopje with energy efficiency measures
- Environmental and Social Management Plan – Checklist with measures – Sub-project: Reconstruction of the PHI University Clinic for Physical Medicine and Rehabilitation – Skopje with energy efficiency measures
Brief description of the project: The implementation of this project includes insulation of the thermal envelope of the building, replacement of the old facade carpentry, further correction of the heating station in order to replace the worn-out equipment, remote control and automation, partial correction of the distribution network inside the institution in full coordination with the heat energy supplier, introduction of energy-efficient lighting and introduction of a solar collector system.
- NOTICE of availability of the document Environmental and Social Management Plan (ESMP) – Checklist and public hearing for the sub-project: Reconstruction of the PHI Health Center – Skopje, Polyclinic “Idadija” with energy efficiency measures
- Environmental and Social Management Plan – Checklist with Measures – Sub-project: Reconstruction of PHI Health Center – Skopje, Polyclinic “Idadija” with Energy Efficiency Measures
PHI University Clinic for Psychiatry – Skopje
Brief description of the project: The implementation of this project includes replacing the electrical installation, replacing the lighting, the heating system, installing a new central cooling system, installing thermal insulation on the building, reconstructing the roof and replacing the windows and doors.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project “Reconstruction of the PHI University Clinic for Psychiatry – Skopje with energy efficiency measures”
- Environmental and Social Management Plan (ESMP) – Sub-project: Reconstruction of the PHI “University Clinic for Psychiatry – Skopje with energy efficiency measures
- NOTICE of public hearing on the document Environmental and Social Management Plan (ESMP) for the sub-project “Reconstruction of the PHI University Clinic for Psychiatry – Skopje with energy efficiency measures”
PHI Health Center “Prof. Dr. Dimitar Arsov”, Kriva Palanka
Brief description of the project: The implementation of this project includes, insulation of the roof structures; insulation of the facade; insulation of floor structures (except for the ground floor); replacement of windows and external doors with new ones in accordance with the criteria given in the Energy Audit Report; improvement of the existing heating system with all necessary measures to obtain an energy-efficient heating system in accordance with Variant 1 of the EC. and replacement of light bulbs with new more energy-efficient ones, including.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “Prof. Dr. Dimitar Arsov”, Kriva Palanka with energy efficiency measures
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of the PHI “Prof. Dr. Dimitar Arsov”, Kriva Palanka with Energy Efficiency Measures
Ambulance n.m. German
Brief description of the project: The implementation of this project includes, insulating the roof structures; insulating the facade; replacing the windows and external doors with new ones in accordance with the criteria given in the Energy Audit Report; replacing and supplementing the existing heating system using variant 1 of the EC, i.e. installing a heat pump, multi-split system; replacing the light bulbs with new, more energy-efficient ones, including the fittings and installation.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “Ambulanta German”, village of German with energy efficiency measures
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of PHI – German Ambulance, German village with energy efficiency measures
Brief description of the project: The implementation of this project includes insulation of the thermal envelope of the building, replacement of the old facade carpentry, introduction of energy-efficient lighting and installation of a new source of central energy supply for heating (water-to-air heat pump).
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “ZD Demir Hisar”, Demir Hisar with energy efficiency measures
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of the PHI “ZD Demir Hisar” with energy efficiency measures
PHI ZD Prim. Dr. Gjorgji Gavrilovski Sveti Nikole, Lozovo outpatient clinic
Brief description of the project: The implementation of this project includes insulation of the thermal envelope of the building, insulation of the ceiling structure from the upper side, further replacement of the old facade carpentry, introduction of energy-efficient lighting, installation of a new source of central energy supply for heating heat pumps and introduction of solar collectors for the preparation of sanitary hot water.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “Prim. Dr. Gjorgji Gavrilovski Sveti Nikole, Lozovo outpatient clinic”, Lozovo with energy efficiency measures
- Environmental and Social Management Plan – Checklist with Measures – Sub-project: Reconstruction of the PHI ZD Prim. Dr. Gjorgji Gavrilovski Sveti Nikole, Lozovo Ambulance with Energy Efficiency Measures
Primary Health Care Center ZD Health – Valandovo
Brief description of the project: The implementation of this project includes, insulating the facade; replacing the windows and external doors with new ones in accordance with the criteria given in the Energy Audit Report; insulating part of the floors in accordance with the recommendations of the EC; replacing and supplementing the existing mechanical valves with new thermostatic valves on the radiator heating system; replacing the light bulbs with new, more energy-efficient ones, including the fittings.
- NOTICE of availability of the document Environmental and Social Management Plan (ESMP) – Checklist for the sub-project: Reconstruction of the PHI “Zdravje”, Valandovo with energy efficiency measures
- Checklist of measures – Environmental and Social Management Plan Sub-project: Reconstruction of the Public Health Institution “Zdravje” Valandovo with energy efficiency measures
PHI ZD “Dr. Nada Mihajlova ” Probishtip”
Brief description of the project: The implementation of this project includes, insulation of roof structures; insulation of the facade; insulating floor structures that are part of the thermal envelope, according to the EC; replacement of windows and external doors with new ones according to the criteria given in the Energy Audit Report; replacement of existing mechanical valves with new thermostatic valves on the radiator network; replacement of light bulbs with new, more energy-efficient ones, including fittings and installation.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “Dr. Nada Mihajlova”, Probishtip with energy efficiency measures
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of PHI “Dr. Nada Mihajlova” Probishtip with Energy Efficiency Measures
PHI Outpatient Clinic Zletovo, municipality Zletovo
Brief description of the project: The implementation of this project includes, insulation of the roof structures; insulation of the facade; insulating floor structures that are part of the thermal envelope, according to the EC; replacement of windows and external doors with new ones according to the criteria given in the Energy Audit Report; replacement of existing mechanical valves with new thermostatic valves in the radiator network; replacement of light bulbs with new, more energy-efficient ones, including fittings and installation; replacement of the existing asbestos-cement roof with a roof made of plastic-coated corrugated steel sheet.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “Ambulanta Zletovo” in the village of Zletovo with energy efficiency measures
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of the PHI Ambulance Zletovo in the village of Zletovo with energy efficiency measures
Demir Kapia Health Station
Brief description of the project: The implementation of this project includes insulation of the thermal envelope of the building, replacement of the asbestos cement roof and insulation of the ceiling structure on the upper side, replacement of the old facade carpentry, introduction of energy-efficient lighting, installation of individual heat pumps for each room and introduction of a system of solar collectors for the preparation of sanitary hot water.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “Health Center Negotino, Health Station Demir Kapija” in Demir Kapija with energy efficiency measures
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of Negotino Health Center, Demir Kapija Health Station, with Energy Efficiency Measures
Health point in the village of Dolni Disan
Brief description of the project: The implementation of this project includes insulation of the thermal envelope of the building, insulation of the ceiling structure on the upper side with stone wool, replacement of the old facade carpentry, introduction of energy-efficient lighting, installation of individual heat pumps for each of the rooms, i.e. local air conditioners and introduction of a system of solar collectors for the preparation of sanitary hot water with a central boiler.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “Health Center Negotino, Health Center Dolni Disan” in Dolni Disan with energy efficiency measures
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of Negotino Health Center, Dolni Disan Health Post, with Energy Efficiency Measures
PHI ZD “Dr. Ivan Georgiev” Pehchevo
Brief description of the project: The implementation of this project includes, insulation of the roof structures; insulation of the facade; insulating floor structures that are part of the thermal envelope, according to the EC; replacement of windows and external doors with new ones according to the criteria given in the Energy Audit Report; replacement and addition of the existing heating system by installing a new independent system/heat pump in the emergency room; replacement of light bulbs with new, more energy-efficient ones, including fittings and installation.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “Dr. Ivan Georgiev”, Pehchevo with energy efficiency measures
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of the PHI “Dr. Ivan Georgiev” in Pehchevo with Energy Efficiency Measures
PHI ZD “Dr. Pance Karagjozov” Stip
Brief description of the project: The implementation of this project includes, insulation of roof structures; insulation of the facade; insulating floor structures that are part of the thermal envelope, according to the EC; replacement of windows and external doors with new ones according to the criteria given in the Energy Audit Report; improvement of the existing heating system with all necessary measures to obtain an energy-efficient heating system according to variant 2 of the EC, central heat pumps, but with modification in terms of replacing the fossil fuel boiler with a pellet boiler, replacing the light bulbs with new, more energy-efficient ones, including fittings and installation.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “Dr. Pance Karagjozov” – Shtip with energy efficiency measures
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of PHI “Dr. Pance Karagjozov” in Shtip with Energy Efficiency Measures
Brief description of the project: The implementation of this project includes, insulation of roof structures; insulation of the facade; insulation of floor structures (except for the ground floor); replacement of windows and external doors with new ones in accordance with the criteria given in the Energy Audit Report; replacement of the existing heating system with a new energy-efficient central heating system in accordance with Variant 2 of the EC, i.e. introduction of a central heat pump; replacement of light bulbs with new more energy-efficient ones, including fittings and installation.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the Public Health Institution “Health Center Kratovo”, Kratovo with energy efficiency measures
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of the Public Health Institution “Healthcare Center Kratovo” in Kratovo with Energy Efficiency Measures
Brief description of the project: The implementation of this project includes replacing the roof covering made of asbestos-cement sheets with plasticized sheet metal, insulating the ceiling structure from the outside with rock wool, introducing energy-efficient lighting, replacing the wood boiler with a new combined boiler with the ability to operate on pellets, a new wood burner, and introducing solar collectors for sanitary hot water.
- NOTICE of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the Public Health Institution “Health Center Resen”, Resen with energy efficiency measures
- Environmental and Social Management Plan (ESMP) – Checklist of Measures – Sub-project: Reconstruction of the PHI “Healthcare Center Resen” in Resen with Energy Efficiency Measures
PHI General Hospital with Extended Activity Debar
Brief description of the project: The implementation of this project includes insulation of the thermal envelope of the building, further replacement of the old facade carpentry, introduction of energy-efficient lighting and installation of a new source of central energy supply for heating (water-to-air heat pump).
- Notice of availability of the Environmental and Social Management Plan (ESMP) document for the sub-project: Reconstruction of the PHI “General Hospital with Extended Activity debar” in Debar with energy efficiency measures.
- Environmental and Social Management Plan – Checklist of Measures – Sub-project: Reconstruction of the PHI General Hospital with Extended Activity Debar with Energy Efficiency Measures
Form for submitting comments on the EMP
- Sub-project: Replacement of street lighting with energy-efficient lamps in the Municipality of Probishtip
Brief description of the project: The implementation of this sub-project contributes to the improvement of the current public street lighting in the entire municipality of Probishtip, and includes the replacement of 1637 existing lamps with new and energy-efficient LED lamps.
Environmental and Social Management Plan
- Sub-project: Replacement of string lights with new energy-saving LED lights throughout all settlements in the municipality of Rankovce
Brief description of the project: Through this sub-project, a total of 409 string lights are being replaced with new energy-efficient LED lights in the settlements of Rankovce, Psacha, Petralica, Opila, Ljubinci and Ginovci in the municipality of Rankovce.
Environmental and Social Management Plan
- Sub-project: Energy efficiency for street lighting for the municipality of Lozovo
Brief description of the project: With the implementation of this sub-project, 450 old light bulbs will be replaced with new energy-efficient LED lights in 8 settlements, Lozovo, Milino, Dorfulija, Karatmanovo, Adzimatovo, Saramzalino, Gjuzemelci and Kjoselari, as part of the municipality of Lozovo.
Environmental and Social Management Plan
- Sub-project: Replacement of existing street lighting in settlements in the municipality of Debrca
Brief description of the project: In 10 settlements (Orovnik, Gorenci, Trebenishta, Volino, Mesheishta, Botun, Zlesti, Belchishta, Leshani and Velmej) in the municipality of Debrca, 1412 LED lamps unsuitable for outdoor installation will be replaced with new LED lamps with new LED technology with high efficiency, low electricity consumption and a minimum lifespan of 100,000 thousand working hours.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Secondary School “Braka Miladinovci” in the village of Dobrushevo with energy efficiency measures
Short description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this primary school will include the following activities: installation of thermal insulation on the facade, installation of dynamic thermostatic valves with a protective head on each radiator in the school, installation of new central heating with a new boiler for classic pellets and biomass pellets (compressed straw), along with accompanying equipment in the existing boiler room of the facility, measures to modernize the lighting, i.e. replacing the existing lighting with appropriate LED lamps and reflectors, installation of a photovoltaic system to cover its own electricity needs. The total net heating area that is the subject of this subproject is 835 m2.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the primary school “Kocho Racin” in the village of Ivanjevci with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this primary school will include the following activities: installation of thermal insulation on the facade with d=10 cm, installation of thermal insulation on the roof with d=15 cm, installation of thermal insulation on the interfloor construction between the basement level and the ground floor level, installation of dynamic thermostatic valves with a protective head on each radiator in the school, installation of a new central heating with a pellet and biomass boiler (compressed straw pellets), along with accompanying equipment in the existing boiler room of the facility, measures to modernize the lighting, i.e. replacing the existing lighting with appropriate LED lamps and reflectors. Installation of photovoltaic panels for own needs. The total net heating area that is the subject of this subproject is 444 m2.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Iljo Lopatichki Sports Hall at the “Goce Delchev Primary School” in the village of Mogila with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this sports hall will include the following activities: installation of a heat recovery system in the ventilation system; installation of a new central heating system with a pellet and biomass system (compressed straw pellets), along with accompanying equipment. This measure also entails the construction of technical rooms (boiler room with storage space) where the equipment will be placed. The new technical rooms are envisaged as an extension of the existing facility (sports hall), modernization of the lighting, i.e. replacement of the existing lighting with appropriate LED lamps and reflectors; installation of photovoltaic panels for own needs. The total net heating area that is the subject of this subproject is 620 m2.
Environmental and Social Management Plan
- Sub-project: Reconstruction of J.O.U.D.G. “Rada Poceva – Grozdoberche” Kavadarci with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this kindergarten will include the following activities: installation of thermal insulation on the roof; additional insulation of external walls with EPS/styrofoam thermal insulation; replacement of existing windows with metal frames and single glass with new ones with PVC frames and full thermal insulation glass; measures to modernize the lighting, i.e. replacement of existing light fittings with overhead fluorescent tubes with light fittings with LED tubes of appropriate strength, installation of photovoltaic panels for own needs.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the J.O.U.D.G. “Rada Poceva – Detelinka” Kavadarci with energy efficiency measures
Brief description of the project: The need for this project arises in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this kindergarten will include the following activities: additional insulation of external walls with EPS/styrofoam thermal insulation; installation of thermal insulation on the roof; installation of a new heating system with heat pumps connected to the existing network with heating elements; installation of nanophotovoltaic panels for own needs.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Primary School “Straso Pindzhur” in the village of Drenovo with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the building. The project to improve the energy efficiency of this school will include the following activities: additional insulation of the roof of the building by supplementing the thermal insulation; additional insulation of the external wall with EPS/styrodur thermal insulation; replacement of the existing wood boiler with a pellet boiler to meet its own heating needs with an adopted capacity of 40kW; installation of dynamic thermostatic valves with a protective head on each radiator in the school. installation of photovoltaic panels for its own needs, with a capacity of 20kWp.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Primary School “Strašo Pindzur” in the village of Marena with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: additional insulation of the roof of the facility by supplementing the thermal insulation; replacement of the existing wood boiler with a pellet boiler to meet its own heating needs with an adopted capacity of 40kW; installation of dynamic thermostatic valves with a protective head on each radiator in the school; installation of photovoltaic panels for its own needs.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Partizan – Kavadarci sports hall with energy efficiency measures
Brief description of the project:rief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this sports hall will include the following activities: installation of thermal insulation on external walls with thermal insulation; installation of thermal insulation on the roof; installation of thermal insulation over the existing floor; installation of a heat recovery system in the ventilation system; installation of a new heating system with heat pumps, measures to modernize the lighting, i.e. replacement of existing light fittings with LED lamps and reflectors; installation of photovoltaic panels for own needs.
Environmental and Social Management Plan
- Sub-project: Reconstruction of J.O.U.D.G. “Rada Poceva – Izvorche” Kavadarci with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this kindergarten will include the following activities: additional insulation of external walls with EPS/styrofoam thermal insulation; installation of thermal insulation on the floor above the basement; installation of a new heating system with heat pumps connected to the existing network with heating elements; installation of photovoltaic panels for own needs.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the J.O.U.D.G. “Rada Poceva – Snezana” Kavadarci with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this kindergarten will include the following activities: additional insulation of the external wall with EPS/styrofoam thermal insulation; installation of thermal insulation on the roof, in the form of rock wool pillows; installation of a new heating system with heat pumps connected to the existing network with heating elements. The existing heating system of the facility with the EL-1 energy source will also be retained and it will serve as a backup option; measures to modernize the lighting, i.e. replacing the existing light fittings with overhead fluorescent tubes with light fittings with LED tubes of appropriate strength. Installation of photovoltaic panels for own needs with a capacity of 47,254 kWh/year.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Primary School “Dimkata A. Gaberot” village of Sopot with energy efficiency measuresод-проект:
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on the roof; additional insulation of the external wall with EPS/styrofoam thermal insulation; replacement of the existing wood boiler with a pellet boiler to meet its own heating needs, installation of dynamic thermostatic valves with a protective head on each radiator in the school. Measures to modernize the lighting, i.e. replacement of the existing light fittings with overhead fluorescent tubes with light fittings with LED tubes of appropriate strength.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the administrative building of the municipality of Pehchevo with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this administrative building will include the following activities: installation of thermal insulation on wall HS2 (border wall to a neighboring building); installation of thermal insulation on a bay window under PP2; replacement of the existing wood boiler with a pellet boiler; repair of parquet flooring in offices on the ground floor and first floor; finishing of walls with plasterboard cladding; construction of partition walls made of plasterboard; modernization of lighting; installation of a photovoltaic system of 24 panels with an installed capacity of 10 kWp for own needs.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Primary School “St. Cyril and Methodius” in the Municipality of Centar, City of Skopje with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on the external wall, installation of thermal insulation on the roof structure, installation of dynamic thermostatic valves, modernization of the lighting.
Environmental and Social Management Plan
- Sub-project: Reconstruction of an administrative building of the municipality of Gostivar with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this administrative building will include the following activities: installation of thermal insulation on external walls, installation of thermal insulation on the roof structure, installation of thermal insulation on the roof structure, replacement of existing facade windows with new windows with PVC frames, installation of a new heating system with heat pumps.
Environmental and Social Management Plan
- Sub-project: Reconstruction and implementation of energy efficiency measures at the primary school “Bradstvo Edinstvo” – Leskajca Ohrid
Short project description: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on external walls, installation of thermal insulation on the roof of the school building, installation of thermal insulation on the roof of the gymnasium, replacement of wooden-framed windows with PVC, replacement of metal-framed windows with PVC, installation of thermal insulation on the floor in the gymnasium, installation of a central heating system with heat pumps.
Environmental and Social Management Plan
- Sub-project: Reconstruction and implementation of energy efficiency measures at the Primary School “St. Kliment Ohridski” Ohrid
Short description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on external walls, installation of thermal insulation on the roof in the gymnasium, installation of thermal insulation on the roof in the auditorium, installation of thermal insulation on the roof, installation of thermal insulation on the roof, replacement of windows with aluminum frames with, measures to modernize the lighting, installation of a central heating system with heat pumps.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Primary School “Hristo Uzunov” in Ohrid with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on external walls; installation of thermal insulation on the roof of the school building; installation of thermal insulation on the roof of the gymnasium; installation of dynamic thermostatic valves; measures for the modernization of lighting.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Dr. Vladimir Polezhinoski Primary School in Kichevo with energy efficiency measures
Short description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on external walls HS1, installation of thermal insulation on external walls HS2 (gymnasium), installation of thermal insulation on the roof structure, installation of thermal insulation on the roof structure of the gymnasium, installation of new facade windows and doors with PVC frames, installation of a heating system with heat pumps, modernization of lighting.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Kuzman Josifovski Pitu Primary School in Kichevo with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on the roof structure, installation of a heating system with heat pumps, modernization of the lighting.
Environmental and Social Management Plan
- Sub-project: Reconstruction of the Secondary School “Reggio Rushit Zajazi” in the village of Zajas, municipality of Kichevo with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on the roof structure, replacement of Lexan NO2, installation of a new heating system with heat pumps, modernization of the lighting.
Environmental and Social Affairs Improvement Plan
- Sub-project: Reconstruction of the POU “Sande Šterjoski” in Kičevo with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on external walls, installation of a new heating system with heat pumps, modernization of lighting.
Environmental and Social Affairs Improvement Plan
- Sub-project: Reconstruction of the 25 Maj Valandovo Cultural Center with energy efficiency measures
Brief description of the project: The need for this project arises in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this cultural center will include the following activities: installation of thermal insulation on the external wall; installation of thermal insulation on the roof structure; installation of thermal insulation on the roof structure; replacement of existing windows and doors with new ones with PVC frames; installation of a pellet boiler and modernization of the lighting.
Environmental and Social Affairs Improvement Plan
- Sub-project: Reconstruction of the administrative building of the municipality of Valandovo with energy efficiency measures
Short project description: The need for this project is imposed in order to improve the current situation and improve the working conditions in the building. The project to improve the energy efficiency of this building will include the following activities: installation of thermal insulation on the external wall; installation of thermal insulation on the roof structure; installation of thermal insulation on the roof structure; replacement of existing windows with new ones with PVC frames; installation of dynamic thermostatic valves; replacement of electric boiler with heat pumps, complete with new parapet units and distribution network; modernization of lighting; installation of photovoltaic panels for own needs.
Environmental and Social Affairs Improvement Plan
- Sub-project: Reconstruction of the “Rajko Zhinzifov” Primary and Secondary School in the municipality of Kisela Voda with energy efficiency measures
Short project description: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on the external wall; installation of thermal insulation on the roof structure; installation of dynamic thermostatic valves; installation of a pellet boiler; modernization of lighting; installation of photovoltaic systems for the production of electricity for its own needs.
Environmental and Social Affairs Improvement Plan
Sub-project: Reconstruction of the kindergarten Kokiče – Nov Dojran with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this kindergarten will include the following activities: installation of thermal insulation on the external wall, installation of photovoltaic panels for its own needs.
Environmental and Social Affairs Improvement Plan
Sub-project: Reconstruction of the POU “Kocho Racin” in Furka with energy efficiency measures
Short project description: The need for this project is imposed in order to improve the current situation and improve the working conditions in the building. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on external walls HS1; installation of thermal insulation on the roof structure PK1; installation of thermal insulation on the floor above the basement PP2; replacement of existing facade windows with new ones with PVC frames; new heating system with individual pellet stoves and measures to modernize lighting.
Environmental and Social Affairs Improvement Plan
Sub-project: Reconstruction of the Primary Educational Institution “Kocho Racin” in Sretenovo with energy efficiency measures
Short project description: The need for this project arises in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on external walls; installation of thermal insulation on the roof structure; replacement of existing facade windows and doors with new ones with PVC frames; measures to modernize lighting and installation of a central pellet heating system with DHW preparation.
Environmental and Social Affairs Improvement Plan
Sub-project: Reconstruction of the Kocho Racin Primary School, village of Gjopceli, municipality of Dojran, with energy efficiency measures
Brief description of the project: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on the roof structure PK1; a new heating system with individual pellet stoves.
Environmental and Social Affairs Improvement Plan
Sub-project: Reconstruction of the Kocho Racin Nov Dojran Primary School in the municipality of Dojran with energy efficiency measures
Short project description: The need for this project is imposed in order to improve the current situation and improve the working conditions in the facility. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on the roof structure; installation of dynamic thermostatic valves; measures to modernize the lighting and installation of solar thermal collectors for preheating the water in the heating system.
Environmental and Social Affairs Improvement Plan
Sub-project: Reconstruction of POU Kocho Racin village Crnicani in the municipality of Dojran with energy efficiency measures
Short project description: The need for this project is imposed in order to improve the current situation and improve the working conditions in the building. The project to improve the energy efficiency of this school will include the following activities: installation of thermal insulation on external walls HS1; installation of thermal insulation on the roof structure PK1; installation of thermal insulation on the floor above the basement PP2; replacement of existing facade windows with new ones with PVC frames; new heating system with individual pellet stoves and measures to modernize lighting.
Financial statements
Contacts
Technical Coordinator
Mr. Rade Lazarevski
Phone: +389 2 3255714
E-mail: rade.lazarevski@finance.gov.mk
Financial Management Specialist
Mr. Simona Stankovic
Phone: +389 2 3255772,
e-mail: simona.stankovic@finance.gov.mk
Procurement Coordinator
Tatjana Velichkovik
Phone: +389 2 3255484
E-mail: tatjana.velichkovik@finance.gov.mk
Civil Engineer
Mr. Jasminka Taseva-Janković
phone: +389 2 3255790, +389 70 379 835
e-mail: jasminka.taseva@finance.gov.mk
Civil Engineer
Filip Mijajlevski
phone: +389 2 3255521, +389 72 796 633
e-mail: filip.mijajlevski@finance.gov.mk
Translator/ Administrator
Ana Damjanoska
phone: +389 2 3255734
e-mail: ana.ristovska@finance.gov.mk
Mechanical Engineer
M.Sc. Gorjan Temelkovski
phone: +389 2 3255664
e-mail: gorjan.temelkovski@finance.gov.mk
Electrical Engineer
Gruica Živić
phone: +389 2 3255737
e-mail: gruica.zivic@finance.gov.mk
Environmental Consultant
Katarina Georgievska
phone: +389 2 3255772, +389 78 796 658
e-mail: katarina.georgievska@finance.gov.mk
Communication Analyst
Mr. Vladimir Grujovski
phone: +389 2 325630,
e-mail: vladimir.grujovski@finance.gov.mk
Administrative Assistant
Mr. Biljana Mladenovska
phone: +389 2 3255736,
e-mail: biljana.mlaenovska@finance.gov.mk